Bowbrook, Revised Proposal, May 2026
About Us
Why Choose HARNCE
HARNCE Heating & Plumbing is a Gas Safe and OFTEC registered heating, plumbing and compliance contractor based in Lichfield, serving South Staffordshire and West Derbyshire. We work with homeowners, landlords and commercial clients, including care homes, schools and businesses, delivering reliable, compliant and customer-first engineering services. We do not subcontract. Every engineer who attends your site works directly for HARNCE and operates to the same standard on every visit.
✓Trained & Qualified Engineers
Credentials & Registrations
Gas Safe Registration
539217
All engineers Gas Safe registered
OFTEC Registration
703243
Oil heating, registered business
LPG
Registered
Liquefied petroleum gas works
Our Commitment to Care Home Clients
We understand that compliance in a care home environment is not a box-ticking exercise, it is a direct safeguard for vulnerable residents. Every HARNCE engineer working in a care setting is trained to the TMV3 standard, understands the regulatory framework that applies to your building, and documents every visit to a standard that will withstand CQC scrutiny. You will never need to chase us for paperwork, it arrives within 5 working days of every visit as standard.
Company Information
| HARNCE Ltd |
| Registered name | HARNCE Ltd t/a HARNCE Heating & Plumbing |
| Company number | 14415548 |
| VAT number | 436417690 |
| Address | 2 The Stables, Elmhurst Business Park, Lichfield, WS13 8EX |
| Freephone | 08000 199 350 |
| Lichfield | 01543 330 555 |
| Email | info@harnce.co.uk |
Your HARNCE Contacts
| Key Contacts |
| Managing Director | Mathew Hance, mathew@harnce.co.uk |
| Technical Director | Neil Harpur, neil@harnce.co.uk |
| Operations Director | Isla Harpur, isla@harnce.co.uk |
| General Enquiries | info@harnce.co.uk |
| Freephone | 08000 199 350 |
| All certificates | Available on request |
08000 199 350 | info@harnce.co.uk
We'll take care of it

Bowbrook, Revised Proposal, May 2026
Why We Are Here
TMV Compliance, Why It Matters
HARNCE was engaged following a compliance inspection at Bowbrook carried out by Total Environmental Compliance Ltd in December 2024. Following review of the asset register and discussion with site management, this revised proposal covers 138 serviceable TMV units, 126 hand wash basin, sink and toilet TMVs, 6 Arjo bath dedicated TMVs and 6 new TMV installations on unprotected mixer tap outlets identified during the HARNCE survey. Shower TMVs have been excluded from the programme at the request of site management.
What is a TMV and Why Does It Matter in a Care Home?
A Thermostatic Mixing Valve blends hot and cold water to deliver a safe, controlled outlet temperature, typically 39–43°C, preventing scalding at the point of use. In a care home where residents may have limited mobility, reduced sensation or cognitive impairment, a failed TMV presents a direct and serious risk of scalding injury. Annual testing and servicing is not optional, it is a legal requirement under multiple regulatory frameworks.
Regulatory Framework
The Legal Requirement
TMV servicing in a care home is governed by a layered framework of legislation, approved codes of practice and industry standards. Non-compliance exposes the operator to regulatory sanction, civil liability and CQC enforcement action.
HSE ACOP L8, Legionella
Approved Code of Practice requiring regular inspection, testing and maintenance of all water fittings including TMVs. Non-compliance is a criminal offence.
HSG274, Technical Guidance
HSE technical guidance supplementing L8. Part 2 covers hot and cold water systems and mandates annual TMV servicing including fail-safe testing to the TMV2/TMV3 scheme.
TMV3 Scheme, Healthcare
Sets the standard for TMVs in healthcare and care environments. Requires annual servicing, fail-safe testing, temperature verification and full documentation by a competent person.
HTM 04-01, Safe Water in Healthcare
NHS Health Technical Memorandum covering water safety in care premises. Sets requirements for TMV installation, maintenance and record keeping in care settings.
Health & Safety at Work Act 1974
Places a duty of care on those in control of premises to protect all persons. A scalding incident from a failed or unserviced TMV would likely constitute a breach of this duty.
Care Quality Commission (CQC)
CQC assessments cover fundamental standards of safety. Water safety compliance and TMV servicing records are an active area of CQC scrutiny in care home inspections.
Revised Scope, 138 Serviceable TMV Units
Following discussion with site management, this proposal covers HWB, sink, toilet and Arjo bath TMVs only. Shower TMVs (90 units) have been excluded at the request of Bowbrook and will be managed in-house. The 6 Arjo bath units are noted separately on all service documentation as dedicated bath TMVs distinct from the sink and HWB units in the same rooms.
08000 199 350 | info@harnce.co.uk
We'll take care of it

Bowbrook, Revised Proposal, May 2026
Part One, Annual Programme
TMV Service, 138 Units
HARNCE offers two service levels for the annual TMV programme across all 138 units. All pricing shown is at standard pay-as-you-go rates. Contract pricing and discounts are shown in the Contract Options section.
Essential Service
Test, record and flag, compliance audit
1.Confirm asset location and verify isolation valves are present and operable✓
2.Run outlet for 60 seconds and record baseline temperature before any intervention, flag immediately if above 41°C✓
3.Verify blended temperature reaches 39–43°C within one minute of flushing✓
4.Perform fail-safe test, isolate cold supply and confirm flow stops completely✓
5.Apply service label and record baseline temperature, pass/fail result and isolation valve condition against asset register✓
6.Provide written list of all failed units to site manager on same day✓
7.Isolate hot and cold supplies fully✗
8.Remove strainer, descale and clean all components thoroughly✗
9.Remove cartridge, inspect all internal components, replace O-ring as standard✗
10.Post-service temperature verification, fail-safe retest and written remedial report✗
~15–20 mins per valve | 138 units
£4,600 ex VAT
Full Service ⭐
Strip, descale, O-ring, certify, full internal inspection
1.Confirm asset location and verify isolation valves are present and operable✓
2.Run outlet for 60 seconds and record baseline temperature, flag immediately if above 41°C✓
3.Isolate hot and cold supplies fully and confirm isolation by briefly opening outlet✓
4.Remove strainer and cartridge, lay all components on a clean tray, note condition of O-rings and seals✓
5.Descale and clean all components, soak strainer in descaling solution, clean cartridge housing and inlet ports, rinse thoroughly✓
6.Replace O-ring as standard, replace strainer or cartridge if scaled beyond cleaning, worn or damaged✓
7.Reassemble valve in correct orientation, refit strainer, cartridge and end cap, reinstall to pipework✓
8.Open cold supply first then hot, check all connections for leaks, allow system to stabilise✓
9.Run outlet for 60 seconds, record post-service temperature, verify within 2°C of baseline and within safe range, adjust or escalate if outside tolerance✓
10.Perform fail-safe test, if hot water continues to flow rather than stopping, valve must be replaced. Record all readings, parts replaced and remedial recommendations on service sheet✓
~35–40 mins per valve | 138 units
£10,200 ex VAT, incl. materials allowance
08000 199 350 | info@harnce.co.uk
We'll take care of it

Bowbrook, Revised Proposal, May 2026
Part Two, Annual Programme
Plant Room Service, All Assets
The plant room service operates to a single comprehensive standard on every annual visit. All pricing is at standard pay-as-you-go rates. Pricing is subject to confirmation following a full pre-contract plant room survey.
One Standard. No Compromise.
For boilers, water heaters and associated plant, HARNCE operates one thorough service standard on every visit. This is a Gas Safe requirement, not a choice.
Boilers, 2 × Elco THISION L ECO 100
| Service Steps |
| Visual inspection of casing, flue and combustion chamber |
| Check and record gas inlet pressure |
| Inspect and clean burner assembly and heat exchanger |
| Check ignition electrodes, flame sensor and all seals |
| Inspect and clear condensate trap and pipework |
| Full combustion analysis, results recorded |
| Test all safety devices and system pressure |
| Complete Gas Safe service record and written report |
Pumps, 2 × Grundfos MAGNA3
| Service Steps |
| Check pump operation, running mode and performance data |
| Inspect for noise, vibration, leaks and electrical connections |
| Check isolation valves and flexible connections |
| Record findings and update asset register |
Expansion Vessels, 3 Units
| Service Steps |
| Isolate and check nitrogen charge pressure |
| Re-inflate to correct pressure if required |
| Inspect shell, Schrader valve and connections for corrosion |
| Reinstate and verify system pressure, record findings |
Water Heaters, 2 × Andrews ECOflo EC380
| Service Steps |
| Inspect casing, flue and all associated pipework |
| Inspect and clean burner and ignition system |
| Check anode rod condition, replace if required |
| Verify thermostat and high limit thermostat operation |
| Full combustion analysis and condensate system check |
| Record stored water temperature for Legionella compliance |
| Check pressure relief valve, complete Gas Safe record |
Pressurisation & Air Separation
| Service Steps |
| Check and record system fill pressure and settings |
| Test high/low pressure alarms and auto-fill function |
| Purge air from separator and flush collected debris |
| Inspect all hoses, connections and isolation valves |
General Plant Room, Every Visit
| Included as Standard |
| Visual inspection of all visible pipework and insulation |
| Check plant room floor for signs of leakage |
| Photograph any areas of concern |
| Written condition report with prioritised recommendations |
| Asset | Units | Est. Time | PAYG Cost |
| Elco THISION L ECO 100 boilers | 2 | ~5 hrs | £500 |
| Andrews ECOflo water heaters | 2 | ~5 hrs | £500 |
| Grundfos MAGNA3 circulation pumps | 2 | ~1.25 hrs | £125 |
| Flamco pressurisation unit | 1 | ~1 hr | £87 |
| Stourflex air & dirt separator | 1 | ~40 mins | £62 |
| Expansion vessels | 3 | ~1.25 hrs | £125 |
| General plant room inspection | — | ~1 hr | £87 |
| Total annual plant room service | — | ~15.5 hrs | £1,600 ex VAT |
08000 199 350 | info@harnce.co.uk
We'll take care of it

Bowbrook, Revised Proposal, May 2026
Choose Your Option
Contract Options
All three options cover the same Essential and Full service levels across all 138 TMV units and the full plant room. The first annual service is invoiced in full on contract signing, payable within 7 days. The first visit is scheduled on receipt of cleared funds. Services 2 onwards are spread over 12 equal monthly payments — each annual service costs the same whether paid upfront or spread monthly.
Pay As You Go
No contract, standard rate
What's Included
✗Discount on works: None, standard rate applies
✗Float stock held: None
✗TMV replacements included: None, quoted separately
✗Price certainty: None, rate card applies
✗CQC compliance letter: Not included
Service Pricing
Essential TMV (138 units)£4,600
Full TMV (138 units, incl. materials)£10,200
Plant room service£1,600
Essential + Plant Room£6,200
Full + Plant Room£11,800
Monthly Payment
No contract
Each visit invoiced separately
2 Year Fixed
10% discount, 3 services total
What's Included
✓Discount on all works: 10%
✓Float stock held: 2 units on hand
✓TMV replacements included: 2 per year at no cost
✓Price certainty: Fixed for 2 years
✗CQC compliance letter: Not included
Service Pricing (10% discount applied)
Essential TMV (138 units)£4,140
Full TMV (138 units, incl. materials)£9,180
Plant room service£1,440
Essential + Plant Room£5,580
Full + Plant Room£10,620
Then Monthly from Month 1
Essential + Plant Room: £465/month
Full + Plant Room: £885/month
Fixed for 24 months, collected by Direct Debit
3 Year Fixed ⭐
15% discount, 4 services total
What's Included
✓Discount on all works: 15%
✓Float stock held: 5 units on hand
✓TMV replacements included: 5 per year at no cost
✓Price certainty: Fixed for 3 years
✓CQC compliance letter: Included annually
Service Pricing (15% discount applied)
Essential TMV (138 units)£3,910
Full TMV (138 units, incl. materials)£8,670
Plant room service£1,360
Essential + Plant Room£5,270
Full + Plant Room£10,030
Then Monthly from Month 1
Essential + Plant Room: £439/month
Full + Plant Room: £836/month
Fixed for 36 months, collected by Direct Debit
Services 2, 3 and 4, Spread Over 12 Monthly Payments Each
On a 2 or 3 year fixed contract, the cost of each subsequent annual service is spread equally over the 12 months that follow, collected by GoCardless Direct Debit. The annual cost is the same whether paid as a lump sum or spread monthly — fixed, predictable payments with no large invoices and no surprises.
08000 199 350 | info@harnce.co.uk
We'll take care of it

Bowbrook, Revised Proposal, May 2026
Pricing Summary
Your Options at a Glance
Contract pricing includes the TMV replacement allowance, float stock holding and a 12.5% contingency for unforeseen time on site. The first service is invoiced in full on contract signing, payable within 7 days. The first visit is scheduled on receipt of cleared funds. Services 2 onwards are spread over 12 equal monthly payments. All prices exclude VAT.
| Option | First Service | Mths 1–12 | Mths 13–24 | Mths 25–36 | Total Saving |
| Essential TMV + Plant Room, PAYG | £6,200 | — | — | — | — |
| Essential TMV + Plant Room, 2 Year Fixed | £5,580 | £465/mth | £465/mth | — | £1,860 |
| Essential TMV + Plant Room, 3 Year Fixed | £5,270 | £439/mth | £439/mth | £439/mth | £3,720 |
| Full TMV + Plant Room, PAYG | £11,800 | — | — | — | — |
| Full TMV + Plant Room, 2 Year Fixed | £10,620 | £885/mth | £885/mth | — | £3,540 |
| ⭐ Full TMV + Plant Room, 3 Year Fixed | £10,030 | £836/mth | £836/mth | £836/mth | £7,080 |
£7,080Guaranteed saving on 4 scheduled services, Full + plant room on 3 year fixed vs PAYG rate
15%Discount on all reactive and remedial works throughout the 3 year term, on top of the scheduled service saving
£7,080Guaranteed minimum saving on scheduled services alone. Reactive discount and price certainty deliver further value on top
Recommended: Full Service, 3 Year Fixed
First service invoiced in full on contract signing, then fixed monthly payments for 36 months
£836/month
After first service of £10,030 ex VAT, payable within 7 days of contract signing
Our Recommendation
The Full service on a 3 year fixed contract delivers comprehensive, CQC-defensible maintenance across all 138 TMV units and the full plant room, with up to 5 TMV replacements per year included, failed valves replaced on the same visit, an annual CQC compliance summary letter, fixed pricing for 3 years and an estimated guaranteed saving of £7,080 on scheduled services alone, with 15% off all reactive and remedial works throughout the term on top compared to standard rates. At approximately £6.36 per TMV per month this is straightforward to justify at any level.
Guaranteed saving vs PAYG: £7,080
First service: £10,030 | Then £836/month
08000 199 350 | info@harnce.co.uk
We'll take care of it

Bowbrook, Revised Proposal, May 2026
Additional Works
Remedial & Recommended Works
The following works have been identified during the compliance inspection and the HARNCE site survey. They are separate from the annual service programme and will be quoted and agreed individually. Contract customers receive the applicable discount on all works listed below.
Section A, TMV Remedial Works
Known Failures, 6 Units Remaining After Shower Exclusion
Note on Revised Defect Count
The original compliance inspection identified 8 TMV failures. Two of those failures, Asset 335618 (Room 12 Iris Shower, failed fail-safe) and Asset 335692 (Room 11 Waterlily Shower, faulty isolation valves), were shower units and have been removed from the remedial scope in line with Bowbrook's instruction to exclude shower TMVs from the programme. Six defects remain.
| Asset ID | Floor | Location | Fixture | Failure Type |
| 335559 | Ground | Room 5 Cardinal | HWB | Blending valve failed fail-safe check |
| 335615 | 1st Floor | Room 14 Iris | HWB | Blending valve failed fail-safe check |
| 335633 | 1st Floor | Room 4 Iris | HWB | Blending valve failed fail-safe check |
| 335645 | 1st Floor | Kitchen Marigold | Sink | Blending valve failed fail-safe check |
| 335711 | 1st Floor | Room 1 Waterlily | HWB | Blending valve failed fail-safe check |
| 335641 | 1st Floor | Assisted Bathroom Iris | HWB | Faulty isolation valves, no access to isolate |
| Remedial Scope | Detail | PAYG | 2 Year (10%) | 3 Year (15%) |
| Type A, Investigation, deep clean & O-ring (5 valves) | 60 mins per valve | £525 | £473 | £446 |
| Type A, Full replacement if valve cannot be restored (5 valves) | Additional 15 mins + valve per unit | £685 additional | £617 | £582 |
| Type B, Isolation valve replacement (1 location) | 2.5 hrs | £310 | £279 | £264 |
| Best case total | Type A clean resolves + Type B | £835 | £752 | £710 |
| Worst case total | All Type A replaced + Type B | £1,520 | £1,368 | £1,292 |
Section B, Recommended TMV Installations
Recommended Works, Pending Authorisation
Pending Client Authorisation
ℹ
6 Mixer Taps, TMV Installation Recommended
During the HARNCE site survey, 6 mixer tap outlets were identified that currently have no TMV protection. It is recommended that TMV2/TMV3 approved thermostatic mixing valves are installed on each of these outlets. These 6 units are included in the 138-unit annual service count from year one of the contract. These works are subject to client authorisation and have not been included in the service contract pricing.
| Recommended Scope | Detail | PAYG | 2 Year (10%) | 3 Year (15%) |
| TMV supply and installation per unit | ~60–75 mins, isolate, fit TMV, test and commission | £224 | £202 | £190 |
| Total for all 6 units | Subject to site access and pipework conditions | £1,344 | £1,210 | £1,142 |
Section C, Plant Room Remedial Works
Plant Room Defects, Survey Findings
⚠
Item 1, Plant Room Floor Leak
Significant rust staining visible on the plant room floor around the dirt separator drain and low-level pipework, indicating an active or historic water leak. Requires investigation, repair or component replacement.
⚠
Item 2, Corroded Expansion Vessel Pipework
The pipework connection at the expansion vessel base shows significant corrosion beyond normal wear, representing a potential system integrity risk. Investigation and likely replacement of the affected section is recommended.
| Remedial Item | PAYG | 2 Year (10%) | 3 Year (15%) |
| Floor leak investigation & repair | £500–£700 | £450–£630 | £425–£595 |
| Corroded expansion vessel pipework | £500–£800 | £450–£720 | £425–£680 |
| Combined plant room remedial budget | £1,000–£1,500 | £900–£1,350 | £850–£1,275 |
08000 199 350 | info@harnce.co.uk
We'll take care of it

Bowbrook, Revised Proposal, May 2026
Terms & Conditions
What You Need to Know
The following terms apply to all works carried out by HARNCE Heating & Plumbing at Bowbrook Care Home under this proposal and any resulting contract.
Scope of Scheduled Works
The fixed contract price covers the annual scheduled TMV and plant room service only. Any additional works identified during a service visit will be quoted and agreed in writing before proceeding at the applicable contract discount rate. Assets not listed on the agreed service register at contract signing are outside scope. Any assets identified on site that are not on the register will be quoted as additional units before being serviced.
Asset Register
HARNCE's service programme is based on the asset register provided by the client or their appointed compliance contractor. HARNCE accepts no liability for assets not included on the register at the time of contract signing. HARNCE will carry out a full site verification survey prior to the first service visit to confirm register accuracy. The survey is completed on the first service visit day and is included within the first service price.
Shower TMV Exclusion, Client Acknowledgement Required
90 shower TMVs have been explicitly excluded from this contract at the written request of Bowbrook Care Home. HARNCE accepts no liability for the condition, performance or compliance status of any shower TMV or any other asset not listed in the agreed service register. By signing this contract, Bowbrook Care Home accepts full responsibility for the ongoing maintenance, testing and compliance of all excluded shower TMV assets.
TMV Replacement Allowance
Up to 2 or 5 TMV2/TMV3 approved replacement valves per year (depending on contract) are included where a valve cannot be restored during the annual service visit. This allowance covers individual valve failures identified during the scheduled annual service only. It does not cover failures resulting from system pressure issues, water quality problems, third party works or events outside HARNCE's control. Emergency reactive replacements outside the annual service visit are chargeable at the HARNCE standard hourly rate of £100 per hour, less the applicable contract discount (10% on 2 year contracts, 15% on 3 year contracts), plus materials at the prevailing trade price plus margin. Replacements beyond the annual allowance are charged at the prevailing trade price plus margin less the applicable contract discount.
Valve Specification
Where replacement is required, HARNCE will fit a TMV2/TMV3 approved valve of equal or greater specification to the existing unit. Where the original valve model has been discontinued or is unavailable, an approved equivalent will be fitted. HARNCE accepts no liability for price variations arising from product discontinuation or supply chain changes beyond its control.
Float Stock
HARNCE maintains a minimum of 2 TMV units (2 year contract) or 5 TMV units (3 year contract) as float stock throughout the duration of the contract. Installation TMVs for the 6 recommended mixer tap outlets are purchased separately as a direct job cost and do not draw from float stock. Used float stock units are replaced within 5 working days. Float stock remains the property of HARNCE until installed.
Access
Bowbrook is responsible for ensuring HARNCE engineers have safe, unobstructed access to all assets within the agreed service register during the scheduled service window. Where access cannot be gained on the day, HARNCE will make one return visit at no additional charge. Subsequent return visits for the same asset will be charged at the standard hourly rate of £100 per hour, plus any materials required. Time spent on site where access is denied due to circumstances beyond HARNCE's control remains chargeable.
Post-Service Liability
HARNCE's service programme tests and certifies each TMV at the point of service. HARNCE accepts no liability for valve performance between service visits, or for changes in water temperature arising from system changes, third party works or component failure after the service date. Bowbrook should report any temperature anomalies immediately so HARNCE can respond promptly.
CQC Compliance Letter
The annual CQC compliance summary letter (included on 3 year contracts) confirms the scope and outcome of HARNCE's annual service programme only. It does not constitute a guarantee of site-wide water safety compliance and does not cover assets outside the agreed service scope, shower TMVs managed in-house, or the period between annual service visits.
Payment Terms
First service invoiced in full on contract signing, payable within 7 days. The first service visit will be scheduled on receipt of cleared funds. Contract services from service 2 onwards collected by GoCardless Direct Debit in equal monthly instalments commencing the month following the first service visit. If a Direct Debit payment fails, HARNCE will notify the client within 5 working days. If payment is not received within 14 days of notification, HARNCE reserves the right to suspend the service programme until the account is brought up to date. Remedial and recommended works invoiced on completion, payable within 14 days.
Price Review
Monthly contract payments are fixed for the duration of the term. HARNCE reserves the right to apply a maximum CPI-linked increase of 5% at the start of year 3 on 3 year contracts only, with a minimum of 30 days written notice. This is a backstop protection only and will not be applied unless cost increases make it necessary. 2 year contract pricing is fully fixed with no review.
Cancellation
Fixed term contracts may not be cancelled during the fixed term except by mutual written agreement. Early termination may be subject to a fee equivalent to the remaining contract value. Cancelled months do not extend the contract term.
Documentation
Full updated asset register, test certificates and written service report provided within 5 working days of every visit. Gas Safe records provided for all gas appliances. CQC compliance summary letter issued annually on 3 year contracts. All documentation is specific to the agreed service scope and assets listed in the service register.
Getting Started
Next Steps
| # | Action | Who |
| 1 | Select service level (Essential or Full) and contract option (PAYG / 2 Year / 3 Year) | Bowbrook |
| 2 | Sign the contract, discount applies immediately to all works including remedials | Both parties |
| 3 | Authorise recommended TMV installations on 6 mixer tap outlets if required | Bowbrook |
| 4 | HARNCE carries out all remedial and recommended works at contract discount rate | HARNCE |
| 5 | HARNCE completes full plant room survey to confirm final contract scope | HARNCE |
| 6 | First annual service completed, all 138 TMVs and full plant room | HARNCE |
| 7 | GoCardless Direct Debit established, monthly payments commence for service 2 | Both parties |
Ready to Talk?
Call us on 08000 199 350, email info@harnce.co.uk or speak to Mathew Hance directly on 07376 181780. We are happy to walk through any part of this proposal or adjust the scope to your requirements. This proposal is valid for 30 days from the date of issue. All prices exclude VAT. Company registration: 14415548. VAT: 436417690.
✉
info@harnce.co.uk
Email us
🌐
harnce.co.uk
Visit our website
HARNCE Heating & Plumbing | Gas Safe: 539217 | OFTEC: 703243 | Reg: 14415548
We'll take care of it